RubyGems Navigation menu

critical-path-css-rails 0.1.0

Only load the CSS you need for the initial viewport in Rails!

Gemfile:
=

Installeer:
=

Versies:

  1. 4.1.1 December 23, 2020 (21 KB)
  2. 4.1.0 April 29, 2020 (21 KB)
  3. 4.0.1 August 19, 2019 (21 KB)
  4. 4.0.0 August 19, 2019 (21 KB)
  5. 3.1.0 April 07, 2019 (20,5 KB)
  6. 0.1.0 September 19, 2015 (15 KB)
Toon alle versies (24 totaal)

Runtime afhankelijkheden (1):

phantomjs ~> 1.9

Eigenaren:

Authors:

  • Michael Misshore

SHA 256 checksum:

=

Total downloads 105.407

Voor deze versie 2.505

Versie vrijgegeven:

Licentie:

MIT

Required Ruby Version: >= 0

Links: